Sabic Chemicals, Middlesborough
Client: Thompsons of Prudoe
Location: Aromatics Plant 1 & 2,
Project Start: 2019 – 2020
Project Overview
Apollo Cradles were commissioned to provide external access by use of mast climbers to support the removal of 2 vertical stacks with an approximate height of 90m. the mast climbers were used to assist in the removal of asbestos and hazardous materials from the stacks. Existing plant structures & utilities were also removed by use of the mast climbers.
Collaborative Planning
In partnership with Thompsons of Prudoe, Apollo co-developed a tailored execution programme to install mast climbers that would:
- Reduce programme time with larger platforms
- Minimise structural ties to the building.
- Increase overall productivity with increased SWL’s
This seamless coordination reflected Apollo’s ethical & problem-solving leadership and low-impact delivery ethos to achieve the high standard the client required on this project.
Engineering Innovation
With the nature of the site being on a Chemical plant it was essential to reduce the requitement for hot works. Apollo were able to minimise the structural ties and further reduce the need for hot works.
A Category 3 temporary works checks was undertaken with full engineering calculations for all elements of the installation.
The alternative was to use a mixture traditional scaffold and boom type powered access which would have been detrimental to the project in terms of
- Cost
- Install & removal times / project programme
- Platform size
- Need for a construction hoist
Outcomes
- 📅 On-schedule delivery with zero operational disruptions.
- 🔍 Full compliance with LOLER 9.2(B) and thorough examination standards.
- 👍 Client recognition for professionalism and adaptability.
- 🛡️ Continuous safety assurance across every work phase.